Breaking


Showing posts with label Track Monitor. Show all posts
Showing posts with label Track Monitor. Show all posts

Sunday, 21 October 2018

17:47

Why Hand Danger Signal Flag In Railways ? How it worked out in Emergency

Why Hand Danger Signal Flag In Railways ? How it worked out in Emergency 
549 /2018-19
18-10-2018
CHENNAI
Track maintainer rushes and waves Danger signal flag at the fast approaching train, averts mishap
Shri.R.Sarangam, Track Maintainer (Gang No.8), while performing duty o­n 14th October, 2018 between Ottivakkam and Chengalpattu in Villupuram – Chengalpattu section of Chennai Division noticed a rail fracture at 9.50 hrs.    At the same time,  train No.16106 Tiruchendur – Chennai Egmore Chendur Express was fast approaching the spot.  Shri.R.Sarangam reacted quickly and rushed towards the speeding train waving the Hand Danger Signal flag as per procedure.  His presence of mind and   momentous decision to wave the danger signal flag averted a probable mishap as the train was stopped just before it approached the rail fracture spot.  The duty conscious staff also informed the section engineers who restored the track in a time bound manner. Normal train services resumed in the section  at 10.40 hrs.  
Shri.R.K.Kulshrestha, General Manager, Southern Railway appreciated the presence of mind and alertness of the track maintainer .  The General Manager  lost no time in felicitating Shri.R.Sarangam for his exceptional service in ensuring safety precautions o­n time.  Shri. R.Sarangam received an award of Rs.2000 and merit certificate from the General Manager. 



Friday, 9 March 2018

19:16

Empowering Women to Show the capabilities -Railways

Empowering Women to Show the capabilities -Railways

09-03-2018
Bhubaneswar
RAILWAY’S UNSUNG LADY WARRIORS

Women are proving their capabilities in large networks like Indian Railways by managing their responsibilities efficiently in every department of Railways. It is a step towards empowering women to show that they too are capable of handling crucial safety related works in train operations.
Purona Sobha, Track Maintainer of Norla Road Station in remote Kalahandi District of Odisha, Belo and Ahalya Bari, Track Maintainer in remote areas in Raipur-Titlagarh-Rayagada-Vizianagaram rail line are the unsung heroes of East Coast Railway who have dedicated their life for safety in train operations.

Monday, 13 November 2017

19:11

East Coast Railway Bound Trains From and To Northern Parts Of India Running Late

East Coast Railway Bound Trains From and To Northern Parts Of India Running Late
02
13-11-2017
Bhubaneswar
ECoR BOUND TRAINS FROM & TO NORTHERN PARTS OF INDIA RUNNING LATE:
RAILWAYS TAKING SAFETY MEASURES DURING FOG,ROUND THE CLOCK CONTROL ROOM WILL MONITOR TRAIN MOVEMENT, CLOSELY.Bhubaneswar, 13.11.2017:
Train servicestowards/from East Coast Railway are being affected  and losing their punctuality due to dense fog in North India, especially in Delhi and North Central region. Many important and prestigious trains like Rajdhani, Duronto, Sampark Kranti, Purusottam, Utkal, Nandankanan, Neelachal, Hirakud Express are being badly affected and their scheduled running paths have gone haywire.
East Coast Railway has urged its passengers to bear with the delay in train running as the situation is unavoidable. Many trains are now being rescheduled and will run o­n changed timings. Passengers are urged to refer to Helpline Enquiry Phone139to know the current status of their trains. Rescheduling of trains would also be announced in the media from time to time. East Coast Railway has already alerted its maintenance staff to be ready for the workload of trains that would be coming out of schedule.  Railways have stepped up monitoring24X7the running of trains and a special drive has now been started with the o­nset of the winter season and prevalence of fog in the morning hours.
East Coast Railway has geared up its manpower to cope with the dense fog during night and early morning in various Railway Sections under its jurisdiction and in the areas prone to be affected by fog and precautions have been taken regarding train running during the current winter season.
In dense fog weather i.e. in winter, drivers have been instructed to regulate train speed depending o­n visibility conditions for the safety of passengers and train movement. Apart from this, several precautions have also been taken and train running staffs are being counselled by the Railway Officers & Safety Counsellors to cope with the situations.
In areas prone to dense fog, luminous and fluorescent strips have been painted in OHE (Overhead Equipment) masts, Level Crossings and at busy traffic areas before an approaching “Stop Signal” to warn the loco pilot that the train is approaching a stop signal and running in sensitive areas. The provision of this device has been of great help to the loco pilots who now can spot these luminous strips even during fog and get extra careful regarding the aspect of the approaching signal.
The Safety Department of East Coast Railway headquarters has given instructions to accord highest priority for safe train running during foggy weather. The loco pilots and guards have been instructed to ensure that, they should put the safety of the passengers at the top and should run trains at such reduced speed in foggy weather as they feel confident and comfortable, even if it means loss of punctuality to the train.
In automatic signal territory, the maximum speed of a train is restricted to 30kmph and in Absolute Block territory the speed is restricted to 60kmph in dense fog. Depending o­n the severity of fog, the driver is expected to control the speed of the train and restrict it further if necessary.
Since the safety of the travelling passengers is top most priority,counselling of Station Staff, Loco-pilots & Guards are being conducted to run the trains in the prescribed speed limit and use of flasher lamps during fog to indicate last vehicle.When the loco pilot in his judgment feels that visibility is restricted due to fog, he has been given the authority to run at a speed at which he feels that he can control the train or stop the train whenever required without taking any risk. This speed shall in any case not be more than 60kmph. The loco pilots have also been advised to whistle frequently to warn the nearby gateman and road users of approaching train.

Wednesday, 17 May 2017

20:15

RUNNING OF TRACK MONITORING SPECIAL ON TRANS - HARBOUR ON 18/19.5.2017 AND HARBOUR LINE ON 29/30.5.2017

RUNNING OF TRACK MONITORING SPECIAL ON TRANS - HARBOUR ON 18/19.5.2017 AND HARBOUR LINE ON 29/30.5.2017
2017/5/11
16-05-2017

RUNNING OF TRACK MONITORING SPECIAL ON TRANS - HARBOUR ON 18/19.5.2017 AND HARBOUR LINE ON 29/30.5.2017

Central Railway Press Release

RUNNING OF TRACK MONITORING SPECIAL on TRANS - HARBOUR AND HARBOUR LINE
Central Railway will run Track Monitoring Special o­n Trans-Harbour and Harbour line for monitoring of tracks as under: -
TRANS-HARBOUR LINE o­n 18 /19.05.2017 (Thursday-Friday  Night)
Nerul         Dep.   : 02.15 hrs           Thane       Arr.  :  02.45 hrs
Thane       Dep.   : 02.55 hrs            Nerul        Arr.  :  03.25 hrs
HARBOUR LINE o­n 29 /30.05.2017 (Monday-Tuesday  Night)
Vashi                  Dep.  : 01.00 hrs      Vadala Road      Arr.   : 01.30 hrs
Vadala Road     Dep.  : 01.40 hrs      Panvel               Arr.    : 02.40 hrs
Panvel               Dep.  : 02.50 hrs      Vashi                 Arr.    : 03.50 hrs
Passengers are requested to note and avoid trespassing, as these specials will run non-stop on these Sections.

Source:CR

Wednesday, 26 October 2016

00:30

RUNNING OF TRACK MONITORING SPECIAL ON TRANS - HARBOUR AND HARBOUR LINE

RUNNING OF TRACK MONITORING SPECIAL ON TRANS - HARBOUR AND HARBOUR LINE

2016/10/19



RUNNING OF TRACK MONITORING SPECIAL ON TRANS - HARBOUR AND HARBOUR LINE

Central RailwayPress Release
RUNNING OF TRACK MONITORING SPECIALON TRANS - HARBOUR AND HARBOUR LINE
Central Railway will runTrack Monitoring Special o­n Trans-Harbour and Harbour line for monitoring of tracksas under: -
TRANS-HARBOUR LINE o­n 25 / 26.10.2016 (Tuesday-Wednesday Night)
Nerul         Dep.   : 02.15 hrs           Thane       Arr.  :  02.45 hrs
Thane       Dep.   : 02.55 hrs            Nerul        Arr.  :  03.25 hrs
HARBOUR LINE o­n 26 / 27.10.2016 (Wednesday-Thursday Night)
Vashi                  Dep.  : 01.00 hrs      Vadala Road      Arr.   : 01.30 hrs
Vadala Road     Dep.  : 01.40 hrs      Panvel               Arr.    : 02.40 hrs
Panvel               Dep.  : 02.50 hrs      Vashi                 Arr.    : 03.50 hrs
Passengers are requested to note and avoid trespassing, as these specials will run non-stop o­n these Sections.



Monday, 29 August 2016

20:54

RUNNING OF TRACK MONITORING SPECIAL ON HARBOUR AND TRANS HARBOUR LINES

RUNNING OF TRACK MONITORING SPECIAL ON HARBOUR AND TRANS HARBOUR LINES

2016/8/15
29-08-2016

RUNNING OF TRACK MONITORING SPECIAL ON HARBOUR AND TRANS HARBOUR LINES

Central Railway will run Track Monitoring Special o­n Trans-Harbour and o­n Harbour lines for monitoring of tracks as under: -

TRANS-HARBOUR LINE o­n 30 / 31.8.2016 (Tuesday-Wednesday Night)

Nerul        Dep.   : 02.15 hrs           Thane       Arr.  :  02.45 hrs
Thane      Dep.   : 02.55 hrs            Nerul        Arr.  :  03.25 hrs

HARBOUR LINE o­n 31.8 /1.9.2016 (Wednesday-Thursday Night)

Vashi                  Dep.  : 01.00 hrs      Vadala Road      Arr.   : 01.30 hrs

Vadala Road     Dep.  : 01.40 hrs      Panvel               Arr.    : 02.40 hrs

Panvel               Dep.  : 02.50 hrs      Vashi                 Arr.    : 03.50 hrs

Passengers are requested to note and avoid trespassing, as these specials will run non-stop on these Sections.

Friday, 6 May 2016

08:02

Running of Track Monitoring Specials on Harbour and Trans-Harbour line.

Running of Track Monitoring Specials on Harbour and Trans-Harbour line.

2016/5/2  
05-05-2016

Running of Track Monitoring Specials on Harbour and Trans-Harbour line.

Running of Track Monitoring Specials on Harbour and Trans-Harbour line.Central Railway will run Track Monitoring Special on Trans-Harbour and o­n Harbour line for monitoring of tracks as under: -
NERUL - THANE TRANS-HARBOUR LINE on 7.5.2016 (Fri-Sat Night)Nerul      Dep.   : 02.15 hrs          Thane       Arr.  :  02.45 hrsThane      Dep.   : 02.55 hrs          Nerul       Arr.  :  03.25 hrs

VASHI-WADALA ROAD- PANVEL HARBOUR LINE on 11.5.2016 (Tue-Wed Night)
Vashi       Dep.  :         01.00 hrs    Vadala Road    Arr.   : 01.30 hrsVadala Road Dep.  : 01.40 hrs    Panvel         Arr.    : 02.40 hrsPanvel      Dep.  :       02.50 hrs    Vashi          Arr.    : 03.50 hrs

Passengers are requested to avoid trespassing as these these specials will run non-stop o­n these Sections .

Wednesday, 10 February 2016

06:36

Central Railway will run Track Monitoring Special on Trans-Harbour and on Harbour line for monitoring of tracks

2016/2/10
09-02-2016

Central Railway will run Track Monitoring Special on Trans-Harbour and on Harbour line for monitoring of tracks

Central Railway Press Release

Central Railway will run Track Monitoring Special o­n Trans-Harbour and o­n Harbour line for monitoring of tracks as under: -

TRANS-HARBOUR LINE on 9 / 10.02.2016 (Tuesday-Wednesday Night)

Nerul      Dep.   : 02.15 hrs          Thane       Arr.  :  02.45 hrs
Thane      Dep.   : 02.55 hrs          Nerul       Arr.  :  03.25 hrs

HARBOUR LINE on 10 / 11.02.2016 (Wednesday-Thursday Night)

Vashi       Dep.  : 01.00 hrs    Vadala Road    Arr.   : 01.30 hrs
Vadala Road Dep.  : 01.40 hrs    Panvel         Arr.    : 02.40 hrs
Panvel      Dep.  : 02.50 hrs    Vashi          Arr.    : 03.50 hrs

Passengers are requested to note that these specials will run non-stop o­n these Sections and avoid trespassing.

Tuesday, 13 October 2015

07:36

Siemens launches RailFusion Big Data Asset Monitoring Software that monitors and analyses Data Points across an entire RailRoad Infra

Siemens launches RailFusion Big Data Asset Monitoring Software that monitors and analyses Data Points across an entire RailRoad Infra

Siemens RailFusion
Siemens, at Railway Interchange-2015 held at Minneapolis between October 4-7, introduced RailFusion, a software solution that monitors and analyzes data points across an entire railroad’s infrastructure including onboard and wayside assets like road crossings and end-of-train devices.


“On any given railroad there are trillions of data points being created by train systems and devices along a line, but this data is simply not being put into action,” said John Paljug, head of Siemens Rail Automation. “RailFusion brings all of these disparate data points together in one system and puts intelligence behind them, allowing railroads to make more informed, efficient decisions about how to operate and maintain their systems specific to their needs.”

Railway Interchange 2015The Siemens RailFusion platform is the next generation of remote monitoring and intelligent asset management. Our platform is designed with the railroad in mind, and is backed by a dedicated team that is there to support the railroads with custom solutions – said a senior executive present at the event. Designed to remotely monitor and analyse data from a wide range of Siemens and third-party assets including level crossing equipment and end-of-train devices, the technology is currently being piloted in North America.
Siemens said RailFusion would provide rail operators with ‘unprecedented insight’, including predictive capabilities to help identify trends so that preventative maintenance can be undertaken before problems occur.

Using RailFusion, monitoring devices can communicate with each other to remotely determine the status and effectiveness of maintenance activities. Level crossing data can be used to identify malfunctions, with occupation data available to help the emergency services identify the quickest route when responding to an incident.

‘On any given railroad there are trillions of data points being created by train systems and devices along a line, but this data is simply not being put into action’, said John Paljug, head of Siemens Rail Automation. ‘RailFusion brings all of these disparate data points together in one system and puts intelligence behind them, allowing railroads to make more informed, efficient decisions about how to operate and maintain their systems specific to their needs.’

Sunday, 30 August 2015

12:22

Indian Railways to procure sensor devices to detect defects on tracks

Railways to procure sensor devices to detect defects on tracks


Govt to buy 6,800 such systems at an estimated cost of Rs 63 crore

In order to prevent catastrophic damages to its assets, Indian Railways is going for offshore procurement of high-powered sensor-based equipment, a first-of-its-kind for the public transporter, to detect defects on tracks and rolling stock.

The sensor-based equipment, known as on board condition monitoring system, currently operational in countries like the US, the UK and Israel, will monitor the condition of tracks, coaches, wagons and locomotives, and send early signal to the control room in case of any deficiency.

"We will purchase 6,800 sensor-based systems to be installed in coaches, wagons and locomotives at an estimated cost of Rs 63 crore," said a senior Railway Ministry official.

Railways will equip the system in selected assets on a trial basis in the current fiscal as it was one of the Rail Budget proposals. The system will be fitted on wheels and the control room will receive signals through vibrations.

The official said the system is operational in railways of the US and the UK, while Israel is using it in its aircraft and helicopter service.

"Any slightest defect on track or rolling stock will be immediately spotted at the control room. Besides, the condition of the assets can be constantly monitored," he said.

Railways will be able to know the exact condition through micro-analysis of data and this will reduce the possibility of sudden catastrophic failures. As a result, the safety aspect of track and rolling stock will be enhanced.

It will also enable the Railways to prepare a predictive maintenance schedule for its assets.

Railways had issued the expression of interest (EoI) seeking response from interested vendors for the Rs 63 crore deal.

"Since it will be procured from outside the country we have sought global response," the official said.


Railways will open the EoI documents on September 7 to know responses from prospective bidders.

Source:http://www.business-standard.com/article/pti-stories/railways-to-procure-sensor-devices-to-detect-defects-on-tracks-115083000123_1.html

Saturday, 8 August 2015

07:43

Track Monitoring Special on Trans-Harbour and on Harbour line

2015/8/16
07-08-2015

Track Monitoring Special on Trans-Harbour and on Harbour line

Central Railway Press Release 

Central Railway will run Track Monitoring Special on Trans-Harbour and o­n Harbour line for monitoring of tracks as under: -

TRANS-HARBOUR LINE on 10/ 11.08.2015 (Monday - Tues Night) Nerul 

Dep.   : 02.15 hrs           Thane       Arr.  :  02.45 hrs Thane     
Dep.   : 02.55 hrs            Nerul        Arr.  :  03.25 hrs

HARBOUR LINE on 11/ 12.08.2015 (Tuesday-Wednesday Night) CST  

Dep.  : 01.10 hrs          Panvel      Arr.   : 02.15 hrsPanvel      
Dep.  : 02.30 hrs          CST         Arr.    : 03.35 hrs

Passengers are requested to note that these specials will run non-stop on these Sections and avoid trespassing.

Tuesday, 28 July 2015

07:31

Indian Railways developed integrated System for maintaining land data and area usages

Indian Railways developed  integrated System for maintaining land data and area usages

Creation of Land Bank in Indian Railways

A web based application called Land Management Module integrated with Track Management System (TMS) of Indian Railways has been developed for maintaining data i.e. details of acquisition/area/usages and land plans of Land Bank of Indian Railways.

A work costing Rs. 36.24 crore has been sanctioned for mapping of all fixed Railway assets on Geographical Information System (GIS) of Bhuvan Satellite Imagery of Indian Space Research Organisation (ISRO) integrated with Track Management System (TMS) of Indian Railways. This system would provide the status of Railway land whether encroached or not and thus would be helpful in tackling the menace of encroachment.

This information was given by the Minister of State for Railways Shri Manoj Sinha in a written reply to a question in Lok Sabha today.

Source: PIBNEWS.

Friday, 22 May 2015

22:24

TRACK MONITORING SPECIAL ON HARBOUR AND TRANS HARBOUR LINE

2015/5/15
22-05-2015

TRACK MONITORING SPECIAL ON HARBOUR AND TRANS HARBOUR LINE

Central Railway will run Track Monitoring Special on Harbour and Trans-Harbour line for monitoring of tracks as under :-

TRANS-HARBOUR LINE on 22/ 23.5.2015 (Friday - Saturday Night)

Nerul        Dep.  02.15 hrs           Thane       Arr.  02.45 hrs
Thane       Dep. 02.55 hrs            Nerul        Arr.  03.25 hrs

HARBOUR LINE on 27/28.05.2015 (Wednesday-Thursday Night)

CST         Dep.  01.10 hrs          Panvel      Arr.  02.15 hrs
Panvel      Dep. 02.30 hrs          CST         Arr.  03.35 hrs

Passengers are requested to note that these specials will run non-stop on these Sections and avoid trespassing.

Tuesday, 28 April 2015

22:40

Track Monitoring Special on Transharbour line (29/30.4.2015 midnight) and Harbour line (30.4.2015/1.5.2015 midnight)

2015/4/21
28-04-2015

Track Monitoring Special on Transharbour line (29/30.4.2015 midnight) and Harbour line (30.4.2015/1.5.2015 midnight)

Central Railway Press Release 

TRACK MONITORING SPECIAL ON HARBOUR AND TRANSHARBOUR LINES 

Central Railway will run Track Monitoring Special on Harbour and Trans-Harbour lines for monitoring of tracks as under :- 

TRANS-HARBOUR LINE on 30.4.2015 (Wednesday-Thursday Night) 

Nerul Dep.  0215 hrs Thane Arr. 0245 hrs

Thane Dep.  0255 hrs Nerul Arr. 0325 hrs


HARBOUR LINE o­n 30.4.2015/1.5.2015 (Thursday-Friday Night) 

Vashi  Dep. 0005 hrs    CST      Arr. 0050 hrs

CST    Dep. 0110 hrs   Panvel   Arr. 0215 hrs

Panvel Dep. 0230 hrs   Vashi    Arr. 0255 hrs 

Passengers are requested to note that these specials will run non-stop o­n these Sections and avoid trespassing.