Breaking


Showing posts with label engineer. Show all posts
Showing posts with label engineer. Show all posts

Monday, 4 January 2016

07:22

Change in Arrival of Trains - South Central Railway

479/2015-16
03-01-2016

Change in Arrival of Trains - South Central Railway

VIJAYAWADA JN. - CHENNAI CENTRAL PINAKINI EXPRESS WILL ARRIVE LATE BY 40 MINUTES

Due to engineering work between Pedapariya – Nayadupeta section, 

Train No.12711 Vijayawada Jn. – Chennai Central Pinakini express will arrive late by 40 minutes on 04.01.2016, 06.01.2016, 07.01.2016 and 11.01.2016.