Breaking


Showing posts with label MAIN LINE. Show all posts
Showing posts with label MAIN LINE. Show all posts

Sunday, 6 March 2022

11:41

Mega Block on 06.03.2022

 Mega Block on 06.03.2022

Mega Block o­n 06.03.2022 (Sunday)

Central Railway, Mumbai Division will operate Mega Block o­n its suburban sections for carrying out various engineering and maintenance works o­n 06.03.2022.

Diva -Kalyan Up and Dn slow lines from 9.00 am to 5.00 pm

Dn Slow/Semi fast services leaving Thane from 8.37 am to 4.36 pm will be diverted o­n Dn fast line between Diva and Kalyan stations, halting at Dombivali station and will arrive destination 10 minutes behind schedule.

Up Slow/ Semi fast services leaving Kalyan from 8.51 am to 3.51 pm will be diverted o­n Up fast line between Kalyan and Diva stations, halting at Dombivali station and further will be re-diverted o­n Up Slow line at Diva station and will arrive destination 10 minutes behind schedule.

Chhatrapati Shivaji Maharaj Terminus – Chunabhatti / Bandra Dn harbour line from 11.40 am to 4.40 pm &

Chunabhatti / Bandra- Chhatrapati Shivaji Maharaj Terminus Up harbour line from 11.10 am to 4.10 pm

Dn Harbour line services to Vashi /Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus / Vadala Road from 11.16 am to 4.47 pm and Dn Harbour line services to Bandra/Goregaon leaving Chhatrapati Shivaji Maharaj Terminus from 10.48 am to 4.43 pm will remain suspended.

Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus leaving Panvel/Belapur/Vashi from 9.53 am to 3.20 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus leaving Goregaon/ Bandra from 10.45 am to 5.13 pm will remain suspended.

However, Special services will run between Panvel and Kurla (Platform No.8) during the block period.

Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm during block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Sunday, 20 February 2022

07:23

Introduction of Additional Suburban Services on Main Line- Revised Time Table

 Introduction of  Additional Suburban Services on Main Line- Revised Time Table 

2022/02/22   

19-02-2022

CR - Introduction of 36 Additional Suburban Services on Main Line Increase in AC Suburban Services on Main Line from 10 to 44

Central Railway Press Release

CR - Introduction of 36 Additional Suburban Services o­n Main Line

Increase in AC Suburban Services o­n Main Line from 10 to 44

Total Number of Suburban Services o­n Central Railway Increase from 1774 to 1810

Central Railway has decided to introduce 36 additional suburban services with revised main line suburban time table with effect from 19.2.2022. The changes in timings of suburban services in accordance with revised timings of Mail/Express trains and commissioning of 5th and 6th line between Thane and Diva.

SALIENT FEATURES OF THE REVISED TIME TABLE

• 36 additional services o­n Main Line. Total number of services o­n Main Line increases from 858 to 894.

• Total number of services o­n Mumbai Division of Central Railway increases from 1774 to 1810

• Total number of AC suburban services o­n Main Line increases from 10 to 44 i.e. 34 new AC services o­n Main Line. Out of 44 AC services, 25 AC services will run as fast services i.e. 24 fast and o­ne semi-fast  

• Total number of fast line services increases from 257 to 270 i.e. 13 more fast line services

• Total number of slow line services increases from 601 to 624 i.e. 23 more slow line services

• With the commissioning of 5th and 6th line few semi-fast services converted into either fast or slow services.

The 44 AC suburban services o­n Main Line will be run utilizing 3 AC rakes, the details of AC suburban services will be as under -

AC – services (Link – 1)

1.   C-4 slow local leaving Kurla at 04.46 hrs arriving CSMT at 05.16 hrs

2.   K-1 fast Local leaving CSMT at 05.20 hrs arriving Kalyan at 06.24 hrs

3.   K-10 fast local leaving Kalyan at 06.32 hrs arriving CSMT at 07.39 hrs

4.   K-17 fast local leaving CSMT at 07.43 hrs arriving Kalyan at 08.46 hrs

5.   K-36 fast local leaving Kalyan at 08.54 hrs arriving CSMT at 09.59 hrs

6.   K-35 fast local leaving CSMT at 10.04 hrs arriving Kalyan at 11.07 hrs

7.   DK-8 fast local leaving Kalyan at 11.22 hrs arriving Dadar at 12.15 hrs

8.   DBL-3 fast local leaving Dadar at 12.30 hrs arriving Badlapur at 13.39 hrs

9.   BL-36 fast local leaving Badlapur at 13.48 hrs arriving CSMT at 15.14 hrs

10. TL-37* fast local leaving CSMT at 15.19 hrs arriving Titwala at 16.39 hrs

11. TL-50* fast local leaving Titwala at 16.47 hrs arriving CSMT at 18.06 hrs

12. T-109 fast local leaving CSMT at 18.10 hrs arriving Thane at 18.52 hrs

13. T-124 slow local leaving Thane at 18.57 hrs arriving CSMT at 19.55 hrs

14. K-117 slow local leaving CSMT at 20.00 hrs arriving Kalyan at 21.28 hrs

15. K-130 slow local leaving Kalyan at 21.36 hrs arriving CSMT at 23.05 hrs

16. T-147* slow local leaving CSMT at 23.12 hrs arriving Thane at 00.07 hrs

AC – services (Link – 2)

1.   T-32 fast local leaving Thane at 08.02 hrs arriving CSMT at 08.50 hrs

2.   K-27 fast local leaving CSMT at 08.56 hrs arriving Kalyan at 09.58 hrs

3.   DK-6 fast local leaving Kalyan at 10.02 hrs arriving Dadar at 10.52 hrs

4.   DBL-1 fast local leaving Dadar at 11.08 hrs arriving Badlapur at 12.21 hrs      

5.   BL-32 fast local leaving Badlapur at 12.27 hrs arriving CSMT at 13.53 hrs

6.   T-77 fast local leaving CSMT at 14.03 hrs arriving Thane at 14.46 hrs

7.   T-88 fast local leaving Thane at 15.03 hrs arriving CSMT at 15.45 hrs

8.   K-83 fast local leaving CSMT at 16.10 hrs arriving Kalyan at 17.18 hrs

9.   K-94 fast local leaving Kalyan at 17.27 hrs arriving CSMT at 18.30 hrs

10. K-103 fast local leaving CSMT at 18.36 hrs arriving Kalyan at 19.41 hrs

11. K-122 slow local leaving Kalyan at 19.56 hrs arriving CSMT at 21.28 hrs

12. K-125 Semi fast local leaving CSMT at 21.42 hrs arriving Kalyan at 23.05 hrs  

13. DK-16 slow local leaving Kalyan at 23.11 hrs arriving Dadar at 00.21 hrs

14. DT-1 slow local leaving Dadar at 00.29 hrs arriving Thane at 01.05 hrs

AC – services (Link – 3)

1.   T-24 slow local leaving Thane at 07.04 hrs arriving CSMT at 08.00 hrs

2.   T-19 fast local leaving CSMT at 08.04 hrs arriving Thane at 08.46 hrs

3.   T-46 fast local leaving Thane at 09.03 hrs arriving CSMT at 09.47 hrs

4.   A-15 fast local leaving CSMT at 09.51 hrs arriving Ambernath at 11.08 hrs

5.   A-30 slow local leaving Ambernath at 11.17 hrs arriving CSMT at 13.02 hrs

6.   T-71 slow local leaving CSMT at 13.06 hrs arriving Thane at 14.06 hrs

7.   T-86 slow local leaving Thane at 14.22 hrs arriving CSMT at 15.20 hrs

8.   DL-29 slow local leaving CSMT at 15.24 hrs arriving Dombivli at 16.43 hrs

9.   DL-36 slow local leaving Dombivli at 16.55 hrs arriving CSMT at 18.14 hrs

10. DL43* slow local leaving CSMT at 18.18 hrs arriving Dombivli at 19.37 hrs

11. DL-48* slow local leaving Dombivli at 19.50 hrs arriving CSMT at 21.12 hrs

12. K-123* slow local leaving CSMT at 21.16 hrs arriving Kalyan at 22.45 hrs

13. K-138* slow local leaving Kalyan at 22.56 hrs arriving CSMT at 00.27 hrs

14. C-3* slow local leaving CSMT at 00.31 hrs arriving Kurla at 01.00 hrs

The services marked () will run o­n Sundays/Holidays with Non AC rake.*

The new suburban time table for Main Line will be available o­n 18.2.2022 o­n website http://www.cr.indianrailways.gov.in follow the link aboutUs/Division/Mumbai/Operating/Timetable   

Source:Central Railway 

Sunday, 12 December 2021

10:08

Mega Block on 12.12.2021

 Mega Block on 12.12.2021

2021/12/26

11-12-2021

Mega Block on 12.12.2021

Central Railway Press Release

Mega Block o­n 12.12.2021

Central Railway, Mumbai Division will operate Mega Block o­n its suburban sections for carrying out various engineering and maintenance works o­n 12.12.2021.

Mulund-Diva Up and Dn slow lines from 11.00 am to 4.00 pm

Dn slow services leaving Dadar from 10.11 am to 3.14 pm will be diverted o­n Dn fast line between Mulund and Diva stations, skipping halt at Kalva and Mumbra stations and further re-diverted o­n Dn slow line at Diva station.

Up slow services leaving Kalyan from 10.27 am to 3.37 pm will be diverted o­n Up fast line between Diva and Mulund stations, skipping halt at Mumbra and Kalva stations and further will be re-diverted o­n Up Slow line at Mulund station.

Panvel- Vashi Up and Dn harbour lines from 11.05 am to 4.05 pm

(Belapur-Kharkopar services not affected; Nerul-Kharkopar services remain cancelled)

Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel from 10.33 am to 3.49 pm and Dn Harbour line services to Panvel/Belapur leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 9.45 am to 3.16 pm will remain cancelled.

Up Transharbour line services towards Thane leaving Panvel from 11.02 am to 3.53 pm and Dn Transharbour line services towards Panvel leaving Thane from 10.01 am to 3.20 pm will remain cancelled.

Dn line services for Kharkopar leaving Nerul from 11.40 am to 3.45 pm and Up line services for Nerul leaving Kharkopar from 12.25 am to 4.25 pm will remain cancelled.

Suburban train services between Belapur and Kharkopar will run as per schedule during the block period.

Special suburban trains will run o­n Chhatrapati Shivaji Maharaj Terminus Mumbai – Vashi section during the block period.

Trans-harbour line services will be available between Thane-Vashi/Nerul stations during the block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Saturday, 20 November 2021

07:17

Mega Block on 21.11.2021

 Mega Block on 21.11.2021 

2021/11/34

19-11-2021

Mega Block on 21.11.2021

Central Railway Press Release

Mega Block o­n 21.11.2021

Central Railway, Mumbai Division will operate Mega Block o­n its suburban sections for carrying out various engineering and maintenance works o­n 21.11.2021.

Thane-Kalyan Up and Dn fast lines from 10.40 am to 3.40 pm

Dn fast services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 9.37 am to 2.48 pm will be diverted o­n Dn slow line between Thane and Kalyan stations halting as per their scheduled halts and will arrive destination 10 minutes later than their schedule arrival.

Up fast services leaving Kalyan from 10.26 am to 3.19 pm will be diverted o­n Up slow line between Kalyan and Thane stations halting as per their scheduled halts and further re-diverted o­n Up fast line at Mulund They will arrive destination 10 minutes later than their schedule arrival.

Kurla-Vashi Up & Dn harbour lines from 11.10 am to 4.10 pm

Dn Harbour line services to Vashi /Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.34 am to 3.39 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur/Vashi from 10.21 am to 3.41 pm will remain cancelled.

However, Special services will run between Chhatrapati Shivaji Maharaj Terminus -Kurla & Panvel - Vashi during the block period.

Harbour line passengers are permitted to travel via Main Line and Transharbour line from 10.00 am to 4.30 pm

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway 

Saturday, 30 October 2021

07:58

Mega Block on 31.10.2021 -Central Railway

Mega Block on 31.10.2021 -Central Railway

2021/10/50

29-10-2021

Mega Block on 31.10.2021

Central Railway Press Release

Mega Block o­n 31.10.2021

Central Railway, Mumbai Division will operate Mega Block o­n its suburban sections for carrying out various engineering and maintenance works o­n 31.10.2021.

Matunga - Mulund Up and Dn Slow Lines from 11.00 am to 4.00 pm

Dn slow line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.18 am to 3.36 pm will be diverted o­n Dn fast line between Matunga and Mulund stations and will not halt at Vidyavihar, Kanjurmarg and Nahur stations. Further will be re-diverted o­n proper slow line at Mulund.

Up slow line services leaving Thane from 10.37 am to 3.55 pm will be diverted o­n Up fast line between Mulund and Matunga and will not halt at Nahur, Kanjurmarg and Vidyavihar stations. Further will be re-diverted o­n proper Up slow line at Matunga station.

Chhatrapati Shivaji Maharaj Terminus – Chunabhatti / Bandra Dn harbour line from 11.40 am to 4.40 pm &

Chunabhatti / Bandra- Chhatrapati Shivaji Maharaj Terminus Up harbour line from 11.10 am to 4.10 pm

Dn Harbour line services to Vashi /Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus / Vadala Road from 11.34 am to 4.47 pm and Dn Harbour line services to Bandra/Goregaon leaving Chhatrapati Shivaji Maharaj Terminus from 9.56 am to 4.43 pm will remain suspended.

Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus leaving Panvel/Belapur/Vashi from 9.53 am to 3.20 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus leaving Goregaon/ Bandra from 10.45 am to 4.58 pm will remain suspended.

However, Special services will run between Panvel and Kurla (Platform No.8) during the block period.

Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm during block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Saturday, 18 September 2021

07:58

Mega Block on 19.09.2021

 Mega Block on 19.09.2021

2021/09/26

17-09-2021

MEGA BLOCK ON 19.9.2021

Central Railway Press Release 

MEGA BLOCK o­n 19.9.2021 

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 19.9.2021. 

Matunga-Mulund Up & Dn Fast Lines from 11.05 am to 04.05 pm 

Dn fast services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.44 pm will be diverted o­n Dn slow line between Matunga and Mulund halting at stations as per their respective schedule. Fast trains beyond Thane will be re-diverted o­n Dn fast line at Mulund and will arrive destination 15 minutes behind schedule. 

Up fast services leaving Thane from 10.46 am to 3.26 pm will be diverted o­n Up slow line between Mulund and Matunga halting at stations as per their respective schedule. Further these Up fast services will be re-diverted o­n Up fast line at Matunga and will arrive destination 15 minutes behind schedule.

Kurla-Vashi Up & Dn harbour lines from 11.10 am to 4.10 pm 

Dn Harbour line services to Vashi /Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.34 am to 3.39 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur/Vashi from 10.21 am to 3.41 pm will remain cancelled. 

However, Special services will run between Chhatrapati Shivaji Maharaj Terminus - Kurla & Vashi - Panvel stations during the block period. 

Harbour line passengers are permitted to travel via Main Line and Transharbour line from 10.00 am to 4.30 pm 

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Saturday, 21 August 2021

07:06

Mega Block on 22.08.2021 -Central Railway

 Mega Block on 22.08.2021 -Central Railway

2021/08/25

20-08-2021

MEGA BLOCK ON 22.08.2021

Central Railway Press Release

MEGA BLOCK o­n 22.08.2021

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 22.08.2021.

Matunga-Mulund Up & Dn Fast Lines from 11.05 am to 04.05 pm

Dn fast services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.44 pm will be diverted o­n Dn slow line between Matunga and Mulund halting at stations as per their respective schedule. Fast trains beyond Thane will be re-diverted o­n Dn fast line at Mulund and will arrive destination 15 minutes behind schedule.

Up fast services leaving Thane from 10.46 am to 3.26 pm will be diverted o­n Up slow line between Mulund and Matunga halting at stations as per their respective schedule. Further these Up fast services will be re-diverted o­n Up fast line at Matunga and will arrive destination 15 minutes behind schedule.

Panvel- Vashi Up and Dn harbour lines from 11.05 am to 4.05 pm

(Excluding Nerul /Belapur-Kharkopar line)

Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel from 10.49 am to 4.01 pm and Dn Harbour line services to Panvel /Belapur leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.03 am to 3.16 pm will remain suspended.

Up Trans-harbour line services towards Thane leaving Panvel from 09.01 am to 3.53 pm will and Dn Trans-harbour line services towards Panvel leaving Thane from 10.01 am to 3.20 pm will remain suspended.

However, special local trains will run o­n Chhatrapati Shivaji Maharaj Terminus Mumbai – Vashi during the block period.

Trans-harbour line services will be available between Thane-Vashi/Nerul stations during the block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Sunday, 27 June 2021

07:38

Mega Block On 27.06.2021

Mega Block On 27.06.2021

2021/06/52

25-06-2021

MEGA BLOCK ON 27.06.2021

Central Railway Press Release

 MEGA BLOCK o­n 27.06.2021 

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 27.06.2021.

 MAIN LINE

Matunga-Mulund Up & Dn Fast Lines from 11.05 am to 04.05 pm

Dn fast services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.44 pm will be diverted o­n Dn slow line between Matunga and Mulund halting at stations as per their respective schedule. Fast trains beyond Thane will be re-diverted o­n Dn fast line at Mulund and will arrive destination 15 minutes behind schedule. 

Up fast services leaving Thane from 10.46 am to 3.26 pm will be diverted o­n Up slow line between Mulund and Matunga halting at stations as per their respective schedule. Further these Up fast services will be re-diverted o­n Up fast line at Matunga and will arrive destination 15 minutes behind schedule.

 HARBOUR LINE:

Mankhurd - Nerul Up & Dn Harbour Lines from 11.15 am to 4.15 pm 

Dn Harbour services for Panvel/Belapur/Vashi leaving Chhatrapati Shivaji Terminus Mumbai from 10.18 am to 3.16 pm and Up Harbour services for Chhatrapati Shivaji Terminus Mumbai leaving Panvel/Belapur/Vashi from 10.45 am to 3.41 pm will remain cancelled.

 However, special services will be run o­n Chhatrapati Shivaji Maharaj Terminus Mumbai-Mankhurd section during the block period.

 Harbour line passengers are permitted to travel via Trans Harbour / Main line from 11.00 am to 4.30 pm o­n their valid tickets.

           These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Saturday, 12 June 2021

08:48

Mega Block on 13.6.2021

 Mega Block on 13.6.2021

2021/06/26

11-06-2021

Mega Block on 13.6.2021 (Sunday)

Central Railway Press Release

Mega Block o­n 13.6.2021 (Sunday) 

Central Railway, Mumbai Division will operate Mega Block o­n its suburban sections for carrying out various engineering and maintenance works o­n 13.6.2021.

Thane-Kalyan Up and Dn Slow Lines From 11.00 am to 4.00 pm

Dn Fast/Semi fast services leaving Mulund from 10.43 am to 3.46 pm will be diverted o­n Dn fast line between Mulund and Kalyan stations, halting at Thane, Diva, Dombivali stations and will arrive destination 10 minutes behind schedule. 

Up Slow/ Semi fast services leaving Kalyan from 10.37 am to 3.51 pm will be diverted o­n Up fast line between Kalyan and Mulund stations, halting at Dombivali, Diva, Thane stations and further will be re-diverted o­n Up Slow line at Mulund station and will arrive destination 10 minutes behind schedule.

Panvel-Vashi Up & Dn harbour lines from 11.05 am to 4.05 pm

(including Belapur/Nerul-Kharkopar section)

Up harbour line services to Chhatrapati Shivaji Maharaj Terminus leaving Panvel/Belapur from 10.49 am to 4.01 pm and Dn harbour line services to Panvel/Belapur leaving Chhatrapati Shivaji Maharaj Terminus from 10.03 am to 3.16 pm and will remain cancelled.

Up Trans-harbour line services to Thane leaving Panvel from 09.01 am to 3.53 pm will Dn and Trans-harbour line services to Panvel leaving Thane from 10.01 am to 3.20 pm remain cancelled.

Up BSU line services for Nerul/Belapur leaving Kharkopar from 10.45 am to 4.00 pm and Dn BSU line services for Kharkopar leaving Nerul/Belapur from 10.15 am to 3.32 pm will remain cancelled.

Special trains will be run o­n Chhatrapati Shivaji Maharaj Terminus- Vashi section during the block period.

Transharbour line services will be available between Thane-Vashi/Nerul stations during the block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Sourcey:Central Railway

Sunday, 7 March 2021

05:58

Mega Block on 07.03.2021- Central Railway

 Mega Block on 07.03.2021- Central Railway

2021/03/08

05-03-2021

Mega Block on 7.3.2021 (Sunday)

Central Railway Press Release

Mega Block o­n 7.3.2021 (Sunday)

Central Railway, Mumbai Division will operate Mega Block o­n its suburban sections for carrying out various engineering and maintenance works o­n Sunday 7.3.2021.

Main Line

Chhatrapati Shivaji Maharaj Terminus and Vidyavihar Up and Dn slow lines 

from 10.55 am to 3.55 pm

Dn slow services leaving Chhatrapati Shivaji Maharaj Terminus from 10.48 am to 3.36 pm will be diverted o­n Dn fast line between Chhatrapati Shivaji Maharaj Terminus and Vidyavihar stations, skipping the halt at Masjid, Sandhurst Road, Chinchpokli, Curry Road, Vidyavihar and further rediverted o­n Dn slow line proper.

Up slow services leaving Ghatkopar from 10.40 am to 3.52 pm will be diverted o­n Up fast line between Vidyavihar and Chhatrapati Shivaji Maharaj Terminus skipping halt at Vidyavihar, Currey Road, Chinchpokli, Sandhurst Road and Masjid.

Services will not be available at Masjid, Sandhurst Road, Chinchpokli, Curry Road and Vidyavihar during the block period.

Harbour Line

Kurla - Vashi Up & Dn harbour lines from 11.10 am to 4.10 pm 

Dn Harbour line services to Vashi /Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.34 am to 3.39 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur/Vashi from 10.21 am to 3.41 pm will remain suspended.

However, Special services will run between Chhatrapati Shivaji Maharaj Terminus-Kurla and Vashi-Panvel sections during the block period.

Harbour line passengers are permitted to travel via Main Line and Trans Harbour line from 10.00 am to 4.30 pm during block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconveniene.

Source:Central Railway

Sunday, 14 February 2021

07:22

Mega Block on 14.02.2021

 Mega Block on 14.02.2021

2021/02/27

12-02-2021

Mega Block on 14.2.2021

Central Railway Press Release

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 14.2.2021.

Matunga - Mulund Up and Dn fast lines from 11.05 am to 4.05 pm

Dn fast services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.44 pm will be diverted o­n Dn slow line at Matunga and will halt as per their respective schedule halts  from Sion to Mulund and will arrive destination 15 minutes behind schedule.  Fast trains beyond Thane will be re-diverted o­n Dn fast line at Mulund. 

Up fast services leaving Thane from 10.46 am to 3.26 pm will be diverted o­n Up slow line at Mulund and will halt as per their respective schedule halts from Mulund to Dadar stations and will be re-diverted o­n Up fast line at Parel. The services will arrive destination 15 minutes behind schedule. 

Chhatrapati Shivaji Maharaj Terminus – Chunabhatti / Bandra Dn harbour line from 11.40 am to 4.40 pm &
Chunabhatti / Bandra- Chhatrapati Shivaji Maharaj Terminus Up harbour line from 11.10 am to 4.10 pm

  • Dn Harbour line services to Vashi /Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai/Vadala Road from 11.34 am to 4.47 pm and 
  • Dn Harbour line services to Bandra/Goregaon leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 09.56 am to 4.43 pm will remain suspended.
  • Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur/Vashi  from 9.53 am to 3.20 pm and 
  • Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Goregaon/ Bandra from 10.45 am to 4.58 pm will remain suspended.
However, Special services will run between Panvel and Kurla (Platform No.8) during the block period.

Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm o­n block day.                

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Sunday, 7 February 2021

06:29

Mega Block on 07.02.2021- Central Railway

Mega Block on 07.02.2021- Central Railway

2021/02/13

06-02-2021

Mega Block on 7.2.2021

Central Railway Press Release

Mega Block o­n 7.2.2021

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 7.2.2021.

Matunga - Mulund Up and Dn fast lines from 11.00 am to 4.05 pm

Dn fast services leaving ChhatrapatiShivajiMaharaj Terminus Mumbai from 10.25 am to 3.44 pm will be diverted o­n Dn slow line at Matunga and will halt as per their respective schedule haltsfrom Sion to Mulund and will arrive destination 15 minutes behind schedule.Fast trains beyond Thane will be re-diverted o­n Dn fast line at Mulund.

Up fast services leaving Thane from 10.46 am to 3.26 pm will be diverted o­n Up slow line at Mulund and will halt as per their respective schedule halts from Mulund to Dadar stations and will arrive destination 15 minutes behind schedule. Fast trains to CSMT will be re-diverted o­n Up fast line at Parel.

Panvel-Vashi Up &Dn Harbour Lines from 11.05 am to 4.05 pm

(Including Belapur/Nerul-Kharkopar line)

Up Harbour line services towards ChhatrapatiShivajiMaharaj Terminus Mumbai leaving Panvel/Belapur from 10.49 am to 4.01 pm and Dn Harbour line services to Panvel/Belapur leaving ChhatrapatiShivajiMaharaj Terminus from 10.03 am to 3.16 pm will remain cancelled.

Up Transharbour line services towards Thane leaving Panvel from 11.02 am to 3.53 pm and DnTransharbour line services to Panvel/Belapur leaving Thane from 10.01 am to 3.20 pm will remain cancelled.

However, special trains will run o­n ChhatrapatiShivajiMaharaj Terminus Mumbai – Vashi section during the block period.

Transharbour line services will be available between Thane-Vashi / Nerul stations during the block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Saturday, 2 January 2021

18:44

Mega Block on 03.01.2021 -Central Railway

 Mega Block on 03.01.2021 -Central Railway

2021/1/1

01-01-2021

Mega Block on 3.1.2021 (Sunday)

Central Railway Press Release

Central Railway, Mumbai Division will operate Mega Block o­n its suburban sections for carrying out maintenance works o­n Sunday 3.1.2021.

Matunga – Mulund Up and Dn fast lines from 11.30 am to 4.30 pm

Dn fast line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.54 am to 4.05 pm will be diverted o­n Dn slow line at Matunga, halting at all stations from Sion to Mulund and will be re-diverted o­n Dn fast line at Mulund and arrive destination 15 minutes behind schedule.

Up fast line services leaving Thane from 11.22 am to 4.17 pm will be diverted o­n Up slow line at Mulund, halting at all stations from Mulund to Dadar and will be re-diverted o­n Up fast line at Parel and will arrive destination 15 minutes behind schedule.

Chhatrapati Shivaji Maharaj Terminus – Chunabhatti / Bandra Dn harbour linefrom 11.40 am to 4.40 pm and

Chunabhatti / Bandra – Chhatrapati Shivaji Maharaj Terminus Up harbour linefrom 11.10 am to 4.10 pm

Dn harbour line services to Vashi/Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai / Vadala Road from 11.34 am to 4.47 pm and Dn harbour line services to Bandra / Goregaon leaving Chhatrapati Shivaji Maharaj Terminus from 9.56 am to 4.43 pm will remain cancelled.

Up harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel / Belapur/ Vashi from 9.53 am to 3.20 pm and Up harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Goregaon / Bandra from 10.45 am to 4.58 pm will remain cancelled.

However, special services will run between Panvel and Kurla (Platform No.8) during the block period.

Harbour line passengers are permitted to travel via main line and Western Railway from 10.00 am to 6.00 pm o­n 3.1.2021. 

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Saturday, 19 December 2020

20:32

Mega Block on 20.12.2020 -Central Railway

 Mega Block on 20.12.2020 -Central Railway

2020/12/58

18-12-2020



Mega Block on 20.12.2020 (Sunday)

Central Railway Press Release

Mega Block o­n 20.12.2020 (Sunday)

Central Railway will operate Mega Block o­n Main line and Harbour line for carrying out essential maintenance work o­n 20.12.2020.

Chhatrapati Shivaji Maharaj Terminus-Vidyavihar Up and Dn slow lines from 10.50 am to 3.50 pm

Dn slow services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.48 am to 3.36 pm will be diverted o­n Dn fast line between Chhatrapati Shivaji Maharaj Terminus and Vidyavihar stations halting at Byculla, Parel, Dadar, Matunga and Sion stations.

Up slow services leaving Thane from 9.54 am to 2.48 pm will be diverted o­n Up fastline between Vidyavihar and Chhatrapati Shivaji Maharaj Terminus halting Sion, Matunga, Dadar, Parel and Byculla stations.

Panvel-Vashi Up & Dn Harbour Lines from 11.05 am to 4.05 pm

(Including Belapur/Nerul-Kharkopar line)

Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur from 10.49 am to 4.01 pm and Dn Harbour line services to Panvel/Belapur leaving Chhatrapati Shivaji Maharaj Terminus from 10.03 am to 3.16 pm will remain cancelled.

Up Transharbour line services towards Thane leaving Panvel from 11.02 am to 3.53 pm and Dn Transharbour line services to Panvel/Belapur leaving Thane from 10.01 am to 3.20 pm will remain cancelled.

However, special local trains will run o­n Chhatrapati Shivaji Maharaj Terminus Mumbai – Vashi section during the block period.

Transharbour line services will be available between Thane-Vashi stations during the block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway


Sunday, 13 December 2020

07:24

Mega Block On 13.12.2020 -Central Railway

 Mega Block On 13.12.2020 -Central Railway

2020/12/33

11-12-2020

Mega Block on 13.12.2020

Central Railway Press Release

Mega Block o­n 13.12.2020

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 13.12.2020.

Thane-Kalyan Up and Dn fast lines from 10.40 am to 3.40 pm

Dn fast services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 9.37 am to 2.48 pm will be diverted o­n Dn slow line between Thane and Kalyan stations halting at all stations between Thane and Kalyan stations.

Up fast services leaving Kalyan from 10.26 am to 3.19 pm will be diverted o­n Up slow line between Kalyan and Thane stations halting at all stations and further re-diverted o­n Up fast line at Mulund halting as per their respective schedule halts.

Panvel-Vashi Up & Dn Harbour Lines from 11.05 am to 4.05 pm

(Including Belapur/Nerul-Kharkopar line)

Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur from 10.49 am to 4.01 pm and Dn Harbour line services to Panvel/Belapur leaving Chhatrapati Shivaji Maharaj Terminus from 10.03 am to 3.16 pm will remain cancelled.

Up Transharbour line services towards Thane leaving Panvel from 11.02 am to 3.53 pm and Dn Transharbour line services to Panvel/Belapur leaving Thane from 10.01 am to 3.20 pm will remain cancelled.

However, special local trains will run o­n Chhatrapati Shivaji Maharaj Terminus Mumbai – Vashi section during the block period.

Trans-Harbour line services will be available between Thane-Vashi stations during the block period.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway

Saturday, 10 October 2020

07:38

Additional Suburban Train Services From 10.10.2020

 Additional Suburban Train Services From 10.10.2020

2020/10/18

09-10-2020

CR to operate 453 suburban trains from 10.10.2020

Central Railway Press Release

CR to operate 453 suburban trains from 10.10.2020

Additional 22 services to the existing 431 services

Additional 22 services break up: 18 specials o­n main line and 04 specials o­n Harbour line

Central Railway currently operates 431 special suburban services for staff as notified by Government of Maharashtra. In order to maintain social distancing and avoid crowding, Central Railway has taken the decision to increase the number of daily special suburban services from 431 to 453 from 10th October, 2020. There is no change in the schedule of existing 431 special suburban services. 

The additional 22 Services will have stoppages at stations as indicated below:

CSMT-Kasara specials will halt at all stations except Thansit and Umbermali.

CSMT-Karjat specials will halt at all stations except Shelu.

CSMT-Panvel specials will halt at all stations except Reay Road, Cotton Green, King’s Circle, Chunabhatti and Manasarovar stations.

All commuters as permitted by Government of Maharashtra are requested to follow social distancing norms and wear mask, while boarding, alighting at railway stations and travelling in special suburban trains.

Together we can fight Corona.

Source:Central Railway

Wednesday, 30 September 2020

20:56

Central Railway to operate Additional Suburban Services from 01.10.2020

Central Railway to operate Additional Suburban Services from 01.10.2020 

2020/09/66

30-09-2020

CR to operate 431 suburban trains from 1.10.2020 - Additional 8 services:4 specials on main line including 2 Ladies’ specials and 4 specials on Transharbour line

Central Railway Press Release

CR to operate 431 suburban trains from 1.10.2020

Additional 8 services to the existing 423 services

Additional 8 services:4 specials o­n main line including 2 Ladies’ specials and 4 specials o­n Trans-harbour line

Central Railway currently operates 423 special suburban services for essential services staff as notified by Government of Maharashtra. In order to maintain social distancing and avoid crowding, Central Railway has taken the decision to introduce ladies’ specials and increase the number of daily special suburban services from 423 to 431 from 1st October, 2020.

Break up of additional 8 services

Mainline

4 services (2 Dn & 2 Up) from/to Kalyan

01 Up ladies special will leave Kalyan at 08.25 hrs and arrive CSMT at 09.34 hrs

01 Dn ladies special will leave CSMT at 17.35 hrs and arrive Kalyan at 18.44 hrs.

Dn special will leave CSMT at 09.45 hrs and arrive Kalyan at 10.50 hrs

Up special will leave Kalyan at 16.10 hrs and arrive CSMT at 17.16 hrs.

(These specials will run as fast and halt at Byculla, Dadar, Kurla, Ghatkopar, Mulund, Thane, Diva and Dombivali o­nly)

Transharbour line

4 services (2 Dn & 2 Up) from/to Thane<->Panvel

Panvel special dep Thane 09.00 hrs Panvel arr 09.52 hrs

Panvel special dep Thane 18.30 hrs Panvel arr 19.24 hrs

Thane special dep Panvel 07.55 hrs Thane arr 08.50 hrs

Thane special dep Panvel 17.20 hrs Thane arr 18.15 hrs

(These specials will run as fast and halt at Rabale, Koparkhairane, Turbhe, Juinagar, Nerul and Belapur o­nly)

It is mentioned here that the special suburban trains and stations over Central Railway, are regularly sanitized & cleaned to upkeep proper hygiene.

All commuters as permitted by Government of Maharashtra are requested to follow social distancing norms and wear mask, while boarding, alighting at railway stations and travelling in special suburban trains.

Together we can fight Corona.

Source:Central Railway

Saturday, 12 September 2020

06:42

Mega Block on 13.09.2020 (Sunday) -Central Railway

Mega Block on 13.09.2020 (Sunday) -Central Railway

2020/09/19

11-09-2020

Mega Block on 5th and 6th line on 13.09.2020 (Sunday) No Mega Block on main line and Harbour Line

Central Railway Press Release

Mega Block o­n 5th and 6th line o­n 13.09.2020 (Sunday)

No Mega Block o­n main line and Harbour Line

Central Railway, Mumbai Division will operate Mega Block o­n 5th and 6th line o­n main line for carrying out various engineering and maintenance works o­n 13.09.2020.

6th and 5thline between Thane and Ghatkopar stations from 11.30 am to 4.30 pm

6th and 5th Between Ghatkopar and Lokmanya Tilak terminus from 1.00 pm to 2.30 pm and 3.15 pm to 6.45 pm

6th and 5thline between Diva and Kalyan from 11.15 am to 2.15 pm

However, special suburban services will run as per schedule

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway


Sunday, 6 September 2020

11:09

Mega Block on 06.09.2020 -Central Railway

Mega Block on 06.09.2020 -Central Railway 

2020/09/06

04-09-2020

Mega Block on 06.09.2020 (Sunday)

Central Railway Press Release

Mega Block o­n 06.09.2020 (Sunday)

No Mega Block o­n Harbour Line

Central Railway, Mumbai Division will operate Mega Block o­n its suburban section for carrying out various engineering and maintenance works o­n 06.09.2020.

Matunga-Mulund Up and Dn fast lines from 10.00 am to 3.00 pm

Dn fast special services leaving Chhatrapati Shivaji Maharaj Terminus from 9.30 am to 2.30 pm will be diverted o­n Dn slow line at Matunga halting as per scheduled halts and further will be re-diverted o­n Dn fast line at Mulund and halt as per respective scheduled halts .

Up fast special services leaving Thane from 9.28 am to 2.26 pm will be diverted o­n Up slow line at Mulund halting as per scheduled halts and further will be re-diverted o­n Up fast line at Matunga and will halt as per respective scheduled halts.

These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

Source:Central Railway