Mega Block on 07.02.2021- Central Railway
2021/02/13
06-02-2021
Mega Block on 7.2.2021
Central Railway Press Release
Mega Block oÂn 7.2.2021
Central Railway will operate Mega Block oÂn its suburban sections for carrying out maintenance work oÂn 7.2.2021.
Matunga - Mulund Up and Dn fast lines from 11.00 am to 4.05 pm
Dn fast services leaving ChhatrapatiShivajiMaharaj Terminus Mumbai from 10.25 am to 3.44 pm will be diverted oÂn Dn slow line at Matunga and will halt as per their respective schedule haltsfrom Sion to Mulund and will arrive destination 15 minutes behind schedule.Fast trains beyond Thane will be re-diverted oÂn Dn fast line at Mulund.
Up fast services leaving Thane from 10.46 am to 3.26 pm will be diverted oÂn Up slow line at Mulund and will halt as per their respective schedule halts from Mulund to Dadar stations and will arrive destination 15 minutes behind schedule. Fast trains to CSMT will be re-diverted oÂn Up fast line at Parel.
Panvel-Vashi Up &Dn Harbour Lines from 11.05 am to 4.05 pm
(Including Belapur/Nerul-Kharkopar line)
Up Harbour line services towards ChhatrapatiShivajiMaharaj Terminus Mumbai leaving Panvel/Belapur from 10.49 am to 4.01 pm and Dn Harbour line services to Panvel/Belapur leaving ChhatrapatiShivajiMaharaj Terminus from 10.03 am to 3.16 pm will remain cancelled.
Up Transharbour line services towards Thane leaving Panvel from 11.02 am to 3.53 pm and DnTransharbour line services to Panvel/Belapur leaving Thane from 10.01 am to 3.20 pm will remain cancelled.
However, special trains will run oÂn ChhatrapatiShivajiMaharaj Terminus Mumbai – Vashi section during the block period.
Transharbour line services will be available between Thane-Vashi / Nerul stations during the block period.
These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.
Source:Central Railway
No comments:
Post a Comment