Breaking


Showing posts with label CMS. Show all posts
Showing posts with label CMS. Show all posts

Thursday, 24 December 2015

07:02

Indian Railways Crew Management System lacks adequate Security Measures: CAG

Indian Railways Crew Management System lacks adequate Security Measures: CAG

New Delhi: The Comptroller and Auditor General of India has observed that the Crew Management System (CMS), a critical IT application of the Indian Railways lacks sufficient security measures to prevent unauthorised access to the system.

CAG in its latest report placed before Parliament found that the system lacked adequate control to ensure completeness, accuracy and validity of data pertaining to various aspects of CMS operations. “The CMS lacked adequate security measures to prevent unauthorised access to the system and uninterrupted operations,” it noted.

The crew management system (CMS) is a critical IT application of the Indian Railways which manages crew assignment to various trains and directly impacts the safety of train operations. The extent of achievement of the objectives of CMS was evaluated by CAG and the aspects relating to IT application controls, IT security, continuity of the organisation’s business, contracting issues, project management/monitoring and change management were also reviewed.

The national auditor noted there was no business continuity plan (BCP) to continue operations round the clock at lobby level. “There was no arrangement for remote backup of data and business continuity plan/disaster recovery plan at remote site was yet to be implemented. No procedure was devised for effecting changes in the software,” CAG observed.

The application aims at managing over one lakh drivers and guards to ensure round the clock safe operations of railways. The objective of this application was to improve the efficiency of train operations, effectively monitor crew and to comply with the safety requirements relating to crew management and to improve the financial management and monitoring.

With a crew of nearly one lakh drivers and guards labouring round the clock, 365 days a year ensuring the nation is not caught on the hop, Indian Railways is among the largest public transport employers in the world. A chink in its operations would mean only one thing: life comes to a standstill in the country.  Among the many mission critical applications in the Indian Railways is the Crew Management System (CMS), a vital component in the smooth functioning of the human resource management arm of the mammoth organisation.  Developed by Centre for Railway Information Systems (CRIS), the software and communications arm of the Indian Railways, CMS automates day-to-day business functioning by monitoring crew movement real-time, duty allocation, payment calculation and crew training in an efficient and transparent manner. This has not only improved the safety of train operations, but also reduced the operational costs by replacing the age-old manual system.

The Centre for Railway Information Systems oversees the computer and IT systems of Indian Railways — one of the largest government-managed rail carriers in the world. The center offers consulting and IT support services to the rail organization.
Challenge:  The Centre for Railway Information Systems (CRIS) is the organization dedicated to managing the IT systems of India Railways — one of the world’s largest rail carriers. India Railways was struggling with the inefficiency of its manual employee scheduling systems. Far too often, train engineers and guards waited for hours to receive their daily assignments and, once assigned, were forced to work extra hours because adequate relief staff had not been properly scheduled.

Solution: CRIS, leveraging IBM software, deployed a crew management system that automatically evaluates employee skill sets against established train schedules to determine optimal staff assignments. And, because the system tracks the locations of working employees in real time, managers can easily shuffle assignments to accommodate any issues (such as a tardy or absent employee). Employees, in turn, are dispatched their orders via text messages as well as in-terminal kiosks.  CRIS developed this crew management system internally, leveraging IBM Rational ®, IBM WebSphere ®, IBM Tivoli ®, IBM DB2 ®, IBM System x ® and IBM System p ® technology.

Classification of Loco Pilots and Guards on Indian Railways

How vigorous is the job profile can be noted from this very fact that the Railway recruits persons as ‘Assistant Loco Pilot’ . They work on freight trains for as long as 10–12 years. During this tenure they are supposed to work with experienced Train Drivers and perform only assisting work during the run of a locomotive i.e. a train. An Assistant Driver thus learns the tactics and dos and don’ts required for train operation. Thereafter they are promoted as ‘Loco Pilot Shunter’, after proper courses and practical trainings, wherein they are supposed to drive locomotives in sheds/yards at not more than 15 km/h speeds. After experiencing for not less than two years, they are promoted as ‘Loco Pilot/Goods’, who are always monitored by their respective ‘Loco Inspectors’.

A train has typical an Assistant Loco Pilot and a Loco Pilot on the Locomotive. The Assistants are normally common but Loco Pilots fall in various categories like Goods Drivers (or Loco Pilots used for running goods trains), Passenger Driver (Driver used to run slow moving Passenger carrying Trains), Mail Express Driver (Driver used to run high speed Passenger carrying Trains) and Rajdhani Drivers (Used for very high speed passenger carrying trains). There is yet another category of crew called ‘Shunters’ who operate only in yards, for moving trains within a particular station yard. Normally Shunters work alone without an Assistant.

The train at the rear end has Guards as its crew. They are categorised as goods guards, passenger guards and mail express guards based on the type of train on which they are working.

Earlier working scenario

The job of a Loco Pilot consists of irregular rest and working hours, eating disorders and sleep disorders. That is why the Railway spends a lot on their trainings and resting time. They are booked from a crew changing point, informed well in advance, after ensuring that they have taken sufficient rest and completed all required trainings and requirements, those are mandatory for train operation. At the end of the journey, they are sent to well maintained rest rooms, given meals (home cooked) and rebooked back to their headquarters after giving minimum stipulated rest.

Latest Developments

Centre for Railway Information Systems (CRIS), an IT development unit for Indian Railways, has developed a software named ‘Crew Management System’, wherein bookings of this sensitive category of people, which was done manually till now and monitored at various levels by Inspectors and Officers, is arranged through software. Crew Management System(CMS) is a unique system in which accuracy and monitoring is automatically maintained. The software system was rolled out in December 2007 and already installed at about 2200 data entry nodes at over 290 crew booking points. These are spread over entire Indian Railways.  CMS at present has a database covering 89,000 crew members and over 30000 crew members are being booked daily through the system. The work has been completed and provided with Thin Clients connected to a server cluster at CRIS, wherein all the functions like crew bookings, call served to crews, their signing on duties are done through computers after ensuring their rest,training and medical particulars. The job which was done manually till a few years back is now monitored automatically. Not only it has a single data base of all the running staff of Indian Railways, but also have an all around reports(more than 500 reports of these crews are visible to the monitoring authorities of the Railways). All the officers sitting in their offices can monitor performance reports of the train operating staff. This enhances the performance planning by the officers. The Ministry of Railways is also doing a great job by motivating such projects and giving sufficient funds for same. A Project which was initially started in Nov 2006 with a team of 5-6 software persons is now managed by a GM rank officer with a dedicated team of inhouse software developers and domain experts, who are basically attached to driving jobs since the last 15–20 years. The system caters for All gauges BG, MG, NG now.

Brief technical particulars
The CMS software is Industry standard software using middle ware and products, hardware components and LAN/WAN network components. The business transactions are transacted so as to provide timely information with increased productivity and reduced paper work to a great extent at the lobby locations. The CMS system is being implemented in the Railways Lobbies at 306 lobby (Location where Railways crew are booked) locations with touch screen along with biometric devices for Sign-On/Off of crew from their duties. The CMS software uses FOIS and Railways network with adequate provision for security in the system so that it is not be vulnerable to hacking from outside. It also has on-line application processing (distributed) & data inter-viewing at the Divisional and Zonal offices.

The different applications of CMS require various levels of organization hierarchy to access it via a web browser. This application extends to various stakeholders and provides a single window interface to the Train Crew.

The CMS software is a centralized architecture using n-tier Java EE architecture with Web Services/Struts framework which works in online mode. All the stakeholders access the applications after user authentication and authorization. The solution has high scalability, flexibility, reliability and is complaint to industry Open Standard specifications. The software solution is :-

Compliant to n-tier Java EE architecture.
Seamless integration of enterprise systems with the existing business applications.
Single sign-on feature.
Open-standards platform supports web service.
Extending existing applications for multiple devices.
Utilizing full advantage of device features for management and interactions from a central location i.e. CRIS.
User friendliness.
End to end linux based System.
Browser access via kiosks and thin clients access.
Comprehensive data validations during capturing.
Industry standards security features.
Interface with SMS gateway for information dissemination and verification.
Online pre-formatted and flexible period report generation.
Highly flexible and high available solution with 24 x 7 uptime.
Content sensitive help
The software is in house software assisted by IBM & HCL in the designs and performance optimisation of the software. These steps are primarily for ensuring a robust and scalable architecture that conforms to open standards and promotes inter-operability duly taking care of the security concerns. The design and implementation of the CMS is expected to lead to the evolution of a truly robust architecture based on the principle of inter-operability and open standards.

SMS feature
The Crew Management System software has a unique feature of booking the crew through SMS. It is sent to the crew through the central database to serve it a call.If the crew acknowledges the call by sending back an acknowledgment through SMS, the crew is booked. This is done for those crews who reside farther than 7–8 km from the crew booking location, else a call boy is sent for the same.Thus the software facilitates faster crew booking.

System generated alerts are also sent to the required personnel in the following manner:-

Morning position of crew strength at various crew booking locations.
Alerts for crew strength at particular crew booking point going below a critical limit.
Automated alerts for their nominated Inspector, for crew becoming due for monitoring.
The crew can have his personnel information like turn of crew booking, Status, PME, Mileage and other Training due dates on his Mobile.
Congratulations on birthdays to crew members of whom date of birth are with the database.

Friday, 25 September 2015

09:39

Andheri derailment: Officials find fault at forged Metal used for Axle that broke

Andheri derailment: Officials find fault at forged Metal used for Axle that broke

Mumbai: The derailment of a Western Railway local train, south of Andheri station on September 15, has the potential to dent two solid reputations – the Rail Wheel Factory (RWF) at Yelahanka, Bengaluru, and a top weapons manufacturing company under the defence ministry based in West Bengal’s 24 Parganas (North) district.

The broken axle of the local that derailed near Andheri on September 15The RWF claims to have a ‘cent per cent’ success record when it comes to the performance of its products like axles. The defence firm is the military’s premier factory to build military hardware as well as the super-strength metal that goes into the creation of these weapons.

Railway officials told that the metal for the axle that broke during the Andheri derailment was forged there. The RWF’s reputation is also under cloud. The website of the railway’s premier wheel-and-axle plant proudly claims that “our dedication to quality is reflected in our performance that not a single product has failed on line till date since inception”.

The website further adds that the “wheels and axles manufactured at RWF meet the Association of American Railroad (AAR) and Indian Railway Standard (IRS) specifications for various railroad applications”, claims Pankaj Jain, GM/RWF.  Reiterating the manufacturing plant’s track record, Pankaj claims “it is true. no product of the RWF has ever failed in service”. He said that the axle was built in 2011 in RWF, but its metal was forged by the West Bengal firm.

On Tuesday, mechanical engineering officials of the metallurgical department of RWF will be in Mumbai, giving their views on the breaking of the axle, built by RWF, under the Indian Railway Standard R43 specifications- of coach 4003B of the train. The breaking of the axle and the subsequent caving in of the wheels of the train is now being seen as ‘the most possible’ reason for the derailment that ended up injuring several people grievously.

RWF officials will be in Mumbai to answer queries as part of the mandated inquiry into the derailment being presided by Commissioner of Railway Safety (CRS) Sushil Chandra. The inquiry is trying to find answers as to why the axle, built in 2011, broke though they have a life of 30 years.

Officials told that the ingredients that went into the making of the axle as well as the way it broke are factors that go way beyond the investigations into the derailment. “It is unprecedented that an axle breaks like this. Even after derailments much bigger in scale than the Andheri one, we have found the wheel-and-axle set and the bogie are completely intact,” they said.

WR suspends man who tested derailed rake

WR officials suspect breakage of axle in the fifth coach of the rake to be responsible for the derailment of seven coaches that caused suspension of services for 21 hours. Nobody had been hurt but severe damage could have happened if the driver of an oncoming train had not applied brakes.

After finding facts in derailment, WR has suspended the Chemical Metreological Superintendent (CMS), who had carried out the ultrasonic test on the rake which derailed between Andheri and Vile Parle on September 15. The suspension order was issued by the WR headquarters on Friday. “The CMS had carried out the test in the last week of June but there was nothing abnormal in the test, else the axle would have been replaced,” a source said. “The test is performed at the Parel workshop when it is brought in. A second test is performed when it is fitted to the coach.”

The faulty axle and wheel was manufactured in 2013 but was fitted onto the ill-fated rake three months ago. The Chief Workshop Manager of Railway Wheel Factory (RWF), Bengaluru, is expected to meet the commissioner of railway safety (Western Circle) Sushil Chandra in a day or two. Chandra will ascertain how the axle broke because this is very rare.

Tuesday, 14 July 2015

07:37

Churchgate effect: Western Railway upgrades its check on loco pilots

Churchgate effect: Western Railway upgrades its check on loco pilots 

The Western Railway on Monday installed a biometric Crew Management System (CMS) as part of its infrastructure, which also includes a breathe-analyser and a web camera, to keep a check on its loco pilots (motormen for long-distance trains), assistant loco pilots and guards. The plan was in the pipeline for a while, but after the recent Churchgate accident, the procedure was speeded up, according to officials.

The motorman in the Churchgate mishap, where the train’s rake crashed into a platform, has tested negative for the alcohol test. However, officials say it is time that a monitoring mechanism is put in place. Officials say the biometric CMS, camera and breathe analyser together will help in ascertaining the precise status of the train staff. It will provide scientific data, without needing manual intervention, they add. Currently, the loco pilots, whose trains ply through the western tracks, get their breathe analysed at Vasai railway station which has the only CMS. “It was developed by the Centre for Railway Information System (CRIS) in the year 2005 and was installed around two years ago at Vasai,” said an official. With an upgraded infrastructure now installed in Bandra, the data will be available in live time, said officials. Also, it will be available from the starting point of the train, instead of from a halt that the staff otherwise have to take for the data to be recorded.

Churchgate train accident: Restoration work remains incomplete despite assurances
Steam locomotive to run in Mumbai

At last,toilets in train engines to help drivers relieve stress

The Western Railway now plans to expand the upgraded infrastructure to Mumbai Central, Vasai, Dahanu, Valsad, Udhana, Surat and Nandurbar. It will be utilised by 700 loco-pilots of long-distance trains and 400 Westen Railway motormen.

“It has a wide screen and the motorman has to log in with his or her depot name, bearing name of the station along with a four-digit number. After feeding the data, the officer needs to put his palm on the screen. The loco-pilot has to correctly feed the data, give his identity and get his breath checked by the analyser which is placed on the right side of the machine. The loco pilot will be considered fit to take the train after he gets a ‘BT clear’ message from the machine,” said a loco-pilot, on the condition of anonymity.
“If this KIOSK of CMS does not clear the motorman, he cannot report to duty and needs to meet the supervisor, “ said a source.

“The biometric CMS is leveraging technology for better efficiency and will be certainly saving time consumed. It is going to be installed very soon for the entire Indian Railway system,” said a Western Railway spokesperson.