Breaking


Wednesday 28 March 2018

Power Block/Line Block at Dindigul Section -Southern Railway

Power Block/Line Block at Dindigul Section -Southern Railway
873/2017-18
27-03-2018
CHENNAI

CHANGES IN TRAIN SERVICES
Due to Line Block / Power Block to facilitate engineering works for commissioning the second broad gauge railway line between Kalpattichatram – Tamaraipadi railway stations in Manaparai – Dindigul section of Madurai Division, changes will be made in the pattern of train services as detailed below.

On 30.03.2018
1.Train No.16127 / 16129 Chennai Egmore – Guruvayur / Tuticorin link express, scheduled to leave Chennai Egmore o­n 30.03.2018, will be diverted from Tiruchchirappalli via Karur to reach Dindigul.Consequently, the train will skip the stoppage at Manaparai.
2.Train No.16128 / 16130 Guruvayur / Tuticorin – Chennai Egmore link express, scheduled to reach Dindigul o­n 30.03.2018, will be diverted from Dindigul via Karur to reach Tiruchchirappalli.Consequently, the train will skip the stoppage at Manaparai.

No comments: