Mega Block (MainLine) on 22.10.2017-Central Railway
2017/10/9
20-10-2017
Main Line Mega Block on 22.10.2017 - No Mega Block on Harbour and Transharbour Lines
Main Line Mega Block on 22.10.2017
There will be no Mega block on Harbour line and Transharbour Line
Central Railway will operate Mega Block on main line for carrying out maintenance work on 22.10.2017. The details are as under:
MULUND-MATUNGA UP FAST LINE FROM 11.20 AM TO 04.20 PM
All UP fast line services leaving Thane from 10.59 am to 04.20 pm will be diverted on Up slow line between Mulund and Parel stations halting at all stations up to Parel and further re-diverted on Up fast line and will arrive destination 20 minutes behind schedule.
Dn fast line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.08 am to 2.42 pm will halt at Ghatkopar, Vikhroli, Bhandup and Mulund stations in addition to their respective scheduled halts and arrive destination 15 minutes behind schedule.
All slow line services leaving/arriving Chhatrapati Shivaji Maharaj Terminus Mumbai between 11.00 am and 6.00 pm will arrive destination 10 minutes behind schedule.
All Mail / Express trains arriving Dadar and Chhatrapati Shivaji Maharaj Terminus Mumbai will be diverted on Up slow line between Mulund and Matunga stations and will arrive destination 20 minutes behind schedule during the block period.
50104 Ratnagiri – Dadar Passenger will be terminated at Diva Jn and
50103 Dadar – Ratnagiri Passenger will depart from Diva Jn. Special suburban service will be run from Dadar to Diva for passengers of 50103 which will depart from Dadar at 03.40 pm, reach Thane at 04.06 pm and arrive Diva at 04.13 pm.
Due to this block, suburban trains are likely to be more crowded than usual. Passengers are requested not to take any risks while travelling. They are also requested to avoid travelling on footboard, rooftop of locals and not to board extremely over crowded trains. These Maintenance blocks are essential for Infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.
Source:Central Railway
No comments:
Post a Comment