Foot Over Bridge with 10 Metre Wide Opens at Bandra Station on 23.01.2020
24-01-2020
Mumbai
W. RLY OPENS NEW 10 METRE WIDE FOOT OVER BRIDGE AT BANDRA STATION W.E.F. 23rd JANUARY, 2020
Closure of North Staircase of Middle FOB on PF No. 4/5at Bandra station w.e.f. 25th January, 2020
W.Rly has commissioned a new 10 metre wide Foot Over Bridge (South) at Bandra station on 23rd January, 2020, connecting Platform No. 6/7 to the East side of the station. This new FOB also connects the old South FOB which is connecting all platforms.
According to a press release issued by Shri Ravinder Bhakar – Chief Public Relations Officer of Western Railway, the new FOB has been constructed at an approx cost of Rs. 6.75 cr and is 99.50 metre long & 10 metre wide. This FOB has 4.00 metre wide staircases that connect to the east side of the station and Platform No. 6/7 and another 3.00 metre wide staircase that connect with old railway South FOB. It is pertinent to mention that, the north staircase of middle FOB at Bandra station on Platform No. 4/5 will be closed from Saturday, 25th January, 2020, to facilitate construction of a new six metre wide Foot Over Bridge. Inconvenience caused is deeply regretted by WR.
Source:Western Railway
Today's Cancelled Trains
No comments:
Post a Comment