Chennai-Arakkonam,Chennai-Gudur Changes in Pattern Of Train Services
CHANGES IN THE PATTERN OF TRAIN SERVICES
Integrated Line Blocks are permitted for engineering works of Track Renewal work and Point Correction work in Chennai – Arakkonam and Chennai – Gudur Sections on Sunday 30th September and Monday 1st October 2018. Consquently, the following are the changes in the pattern of Train Services :-
TRAINS FULLY CANCELLED ON 30th SEPTEMBER 2018
Train No..43001 MMC – Avadi EMU leaving MMC at 00.15 hrs
Train No.43801 Chennai Beach – Arakkonam EMU leaving Chennai Beach at 01.20 hrs
Train No.43402 Arakkonam – MMC EMU leaving Arakkonam at 03.45 hrs
Train No.43891 Avadi – Pattabiram Military Siding EMU leaving Avadi at 02.50 hrs.
Train No.43102 Pattabiram Military Siding – MMC EMU leaving at 03.20 hrs
Train No.43501 MMC – Tiruttani EMU leaving MMC at 04.00 hrs
Train No.43504 Tiruttani – MMC EMU leaving Tiruttani at 06.30 hrs
Train No.43101 MMC – Pattabiram Military siding EMU leaving MMC at 04.10 hrs
Train No.43104 Pattabiram Military Siding – MMC EMU leaving at 05.30 hrs
Train No.43201 MMC – Tiruvallur EMU leaving MMC at 03.40 hrs
Train No.43202 Tiruvallur – MMC EMU leaving Tiruvallur at 03.50 hrs
Train No.43803 Chennai Beach – Arakkonam EMU leaving Chennai Beach at 04.20 hrs
Train No.43932 Arakkonam – Chennai Beach EMU leaving Arakkonam at 04.00 hrs
Train No.42001 MMC – Gummidipoondi EMU leaving MMC at 00.15 hrs
Train No.42002 Gummidipoondi – MMC EMU leaving Gummidipoondi at 02.45 hrs
Train No.42421 MMC – Sullurupetta EMU leaving MMC at 19.00 hrs
Train No.42422 Sullurupetta – MMC EMU leaving Sullurupetta at 21.40 hrs
Train No.42452 Sullurupetta – Gummidipoondi EMU leaving Sullurupetta at 23.00 hrs
TRAINS PARTIALLY CANCELLED ON 30TH SEPTEMBER 2018
Train No.42423 MMC – Sullurupetta EMU leaving MMC at 20.35 hrs will run only upto Gummidipoondi, and is partially cancelled between Gummidipoondi and Sullurupetta on 30th September 2018
TRAIN REGULATED
Train No.13351 Dhanbad – Alleppey Express arriving Chennai Central at 01.35 hrs on 1st October 2018 (i.e. midnight of 30th September) will be regulated enroute in Gudur – Chennai section for about 180 minutes ( 3 hours )
Source:Southern Railway
Source:Southern Railway
No comments:
Post a Comment