Breaking


Showing posts with label Diamond Quadrilateral. Show all posts
Showing posts with label Diamond Quadrilateral. Show all posts

Friday, 23 October 2015

08:57

Japan offers Loan to India’s $15 billion Bullet Train in edge over China

Japan offers Loan to India’s $15 billion Bullet Train in edge over China

Japan has offered to finance India’s first bullet train, estimated to cost $15 billion, at an interest rate of less than 1 percent, officials said, stealing a march on China, which is bidding for other projects on the world’s fourth-largest network.
Tokyo was picked to assess the feasibility of building the 505-kilometre corridor linking Mumbai with Ahmedabad, the commercial capital of Prime Minister Narendra Modi’s home state, and concluded it would be technically and financially viable.

The project to build and supply the route will be put out to tender, but offering finance makes Japan the clear front runner.

Last month China won the contract to assess the feasibility of a high-speed train between Delhi and Mumbai, a 1,200-km route estimated to cost twice as much. No loan has yet been offered.

Japan’s decision to give virtually free finance for Modi’s pet programme is part of its broader push back against China’s involvement in infrastructure development in South Asia over the past several years. Tokyo’s push in India comes just weeks after it lost out to China on the contract to build Indonesia’s first fast-train link.

Beijing offered $5 billion in loans without asking for guarantees, an Indonesian official said, ending a months-long battle to build the line linking Jakarta with the textile hub of Bandung.

India’s cabinet will take a decision on the Japanese proposal over the next few weeks, an Indian railway official said

“There are several (players) offering the high-speed technology. But technology and funding together, we only have one offer. That is the Japanese,” said A.K.Mital, the Chairman of the Indian Railway Board, which manages the network.

The two projects are part of a ‘Diamond Qaudrilateral’ of high speed trains over 10,000 km of track that India wants to set up connecting Delhi, Mumbai, Chennai and Kolkata.

Japan has offered to meet 80 percent of the Mumbai-Ahmedabad project cost, on condition that India buys 30 percent of equipment including the coaches and locomotives from Japanese firms, officials said.

Japan’s International Cooperation Agency, which led the feasibility survey, said the journey time between Mumbai and Ahmedabad would be cut to two hours from seven. The route will require 11 new tunnels including one undersea near Mumbai.

“What complicates the process is Japanese linking funding to use of their technology. There must be tech transfer,” said Mital.

JICA declined to comment on the details of its offer. “The report has already been handed over to India, and the Indian government is now in the process of making a consideration,” a spokeswoman said.

Toshihiro Yamakoshi, counsellor in the economic section of the Japanese embassy, said Japanese companies were keen to collaborate with their Indian counterparts on the rail project as part of Modi’s Make-in-India programme. He said it was too early to provide details of the cooperation.

Tokyo’s push in India comes just weeks after it lost out to China on the contract to build Indonesia’s first fast-train link.

Beijing offered $5 billion in loans without asking for guarantees, an Indonesian official said, ending a months-long battle to build the line linking Jakarta with the textile hub of Bandung.

Japan’s NHK broadcaster quoted Transport Minister Keiichi Ishii as saying that Prime Minister Shinzo Abe had instructed him to step up exports of transport systems to India and Southeast Asia.

“It is very regrettable that a high-speed railway project in Indonesia was awarded to China,” he said.

China won the Delhi-Mumbai survey after securing clearance from Indian security agencies long worried about China’s involvement in Indian infrastructure.

The two neighbours fought a war in 1962 over a border dispute that remains unresolved, though trade between them is booming.

India’s cabinet will take a decision on the Japanese proposal over the next few weeks, an Indian railway official said. He said there were lingering concerns about whether the billions of dollars required for high-speed rail might be more usefully spent in modernising the railway system.

“There is a lot of money involved in this. The different departments are weighing the implications. Should we be committing all our resources to a single high-speed line,” the railway official said on condition of anonymity.”

“The railways have not attempted anything as big as this before in terms of costs,” the official said.

India’s rickety state-controlled rail system, which moves 23 million people a day, has a poor safety record and is in desperate need of funds to modernise it.

The average speed of trains is 54km/hour, and rail experts have argued that the priority ought to be to improve the speed and safety on existing trains and routes.

Monday, 4 May 2015

10:47

AP plan to link Chennai-Hyderabad High Speed Rail network with proposed Capital Region

AP plan to link Chennai-Hyderabad High Speed Rail network with proposed Capital Region

Vijayawada (BZA): In what could revolutionize the rail network in the capital city area, the state government has set its eyes on linking the entire capital city region with the proposed high speed train corridor between Chennai and Hyderabad. A proposal to rope in firms from China and Japan to take up the high speed rail project is under active consideration of the Chandrababu Naidu government.

With the Chennai-Hyderabad corridor passing through Vijayawada, the Naidu government wants to expand the high speed rail network to key stations in the Capital Region Development Authority (CRDA) area. The government has already identified 40 such stations in the CRDA limits which would get semi-high speed or high speed train network. Besides the district headquarter towns of Machilipatnam and Guntur, municipal towns like Gudivada, Tenali, Sattenapalle and Mangalagiri would be included in the high speed train connectivity plan.

“Our main aim is to make the capital city region connected with all the metros in the country and the high speed train network provides just that. Most of the municipal towns in the capital city area will come under the ambit of this network,” CRDA commissioner N Srikanth told TOI. The Centre has already cleared nine key routes for upping the speed limits of trains from the existing 100 kmph to 150-160 kmph.

While the New Delhi-Agra section is almost ready to run the semi-high speed trains, the other eight routes, including Chennai-Hyderabad, have been cleared in the recent railway budget. Japan External Trade Organisation (JETRO), Oriental Consultancy and Parsons Brinckerhoff, a multinational engineering and design firm, have started studying the feasibility of the high speed rail network between Chennai and Hyderabad.

“I have suggested to the state government to opt for the high speed train network to connect Guntur-Tenali-Mangalagiri towns with Vijayawada metro project as it would be less expensive,” metro rail project advisor E Sreedharan reasoned. While the proposed metro rail project is expected to cost around Rs 250-Rs 300 crore per km, the high speed train network would cost around Rs 70-Rs 100 crore per km.

According to sources, the state government has asked Singapore master plan designers to take the high speed train network proposal into consideration while finalizing the master plan for the capital city. Although the Centre has decided to run high speed trains in select routes, the state government is pitching for the network to lure investors and tourists to the capital city area.

The railway ministry had granted nod for the high speed train network under ‘diamond quadrilateral’ (Delhi-Mumbai-Chennai-Kolkata-Delhi) project for about 7,000 km. Nearly a 1,000 km line passes through Andhra Pradesh, including Vijayawada. While the semi-high speed trains run at a speed of 160 kmph, high speed trains are set to chug along at 250-300kmph.

Sunday, 12 April 2015

19:45

A pact was signed during Prime Minister Narendra Modi’s France visit for cooperation between Indian Railways and French Railways for this semi-high speed rail project.

Train travel between Delhi and Chandigarh may come down to less than two hours with France coming on board for 200-km per hour rail project.

This 266-km stretch is covered in three hours and 25 minutes at present by Shatabdi Express, the fastest train on this route with an average speed of 79.8 km per hour.

The Railways is looking to reduce the travel time to less than two hours, if the proposed upgradation project goes on track to run trains at a speed of 200 kilometres per hour.

This takes into account the stoppages and other factors such as time lapse in attaining the maximum speed.

A pact was signed during Prime Minister Narendra Modi’s France visit for cooperation between Indian Railways and French Railways for this semi-high speed rail project.

Under this, French National Railways has agreed to co-finance an execution study for “a semi-high speed project on upgradation of the Delhi-Chandigarh line to 200 kmph”.

The study by the French National Railways will be the first step towards execution of the semi-high speed train project on the Delhi-Chandigarh route, said a senior Railway Ministry official, who is involved with this project.

He said French National Railways is known for advanced signalling systems and it can play a key role in this project.

The study will be followed by upgrading the signalling system, strengthening of the tracks and track-fencing in certain areas to enable operation of semi-high speed trains.

Railways has decided to introduce semi-high speed trains on eight more routes including Delhi-Agra, Delhi-Kanpur, Chennai-Hyderabad, Nagpur-Secunderabad and Mumbai-Goa.

The ministry official said that Railways is looking to reduce the travel time between major cities by running semi-high speed trains at a speed of 160-200 km per hour.

Trial runs are being carried out on Delhi-Agra route to run trains at a speed of 160 km per hour.

Incidentally, French consultancy Systra is involved in the pre-feasibility study of a proposed bullet train on the 450-km-long Delhi-Chandigarh-Amritsar corridor project.

Semi-high speed trains can run at up to 200 km per hour, while faster ones come in the category of high-speed or bullet trains. Railways is planning a ‘Diamond Quadrilateral’ to connect top four cities with a high-speed train network.

Source:The Financial Express.