Breaking


Saturday, 4 December 2021

Traffic and Power Block on 5.12.2021

Traffic and Power Block on 5.12.2021

03-12-2021

Press Release: TRAFFIC & POWER BLOCK ON 05.12.2021 FOR CONSTRUCTION OF FOOT OVER BRIDGE AT JAMTARA STATION

TRAFFIC & POWER BLOCK o­n 05.12.2021 FOR CONSTRUCTION OF FOOT OVER BRIDGE AT JAMTARA STATION

Kolkata, December 3, 2021:

 For construction of Foot Over Bridge at Jamtara station of Asansol division, 240 minutes (07:15 hrs. to 11:15 hrs.) Traffic & Power Block has been planned o­n 05.12.2021 (Sunday).

Consequently the following arrangements in train running have been made:

·03678 Baidyanathdham – Asansol MEMU, 03681 Asansol – Jasidih MEMU, 03539/03538 Andal – Jasidih – Andal DEMU and 03581/03582 Jasidih – Banka – Jasidih DEMU will remain cancelled o­n 05.12.2021.

·03675 Asansol – Jhajha MEMU will be Rescheduled by 60 minutes from Asansol Jn. o­n 05.12.2021.

Moreover, 13508 Gorakhpur – Asansol Express will be suitably controlled over Eastern Railway and East Central Railway jurisdiction for 70 minutes and 12326 Nangal Dam – Kolkata Express will be suitably controlled over Eastern Railway jurisdiction for 45 minutes o­n 05.12.2021.

Source:Eastern Railway

No comments: