Breaking


Sunday, 5 July 2020

Mega Block on 05.07.2020 -Central Railway

Mega Block on 05.07.2020 -Central Railway
2020/07/06
04-07-2020


Mega Block o­n Sunday 05.07.2020
Central Railway, Mumbai Division will operate Mega Block o­n its suburban sections for carrying out various engineering and maintenance work o­n Sunday 05.07.2020.
MAIN LINE
Vidyavihar – Thane Up and Dn fast lines from 10.30 am to 3.30 pm
Dn fast special services leaving Chhatrapati Shivaji Maharaj Terminus from 9.45 am to 2.30 pm will be diverted o­n Dn slow line between Matunga  and Diva, halting as per scheduled halts and further rediverted o­n Dn fast line at Diva.
Up fast special services leaving Diva from 9.58 am to 3.18 pm will be diverted o­n Up slow line between Diva and Matunga halting as per scheduled halts and further rediverted o­n Up fast line at Matunga.
HARBOUR LINE
Chhatrapati Shivaji Maharaj Terminus – Chunabhatti Dn harbour line from 11.25 am to 4.25 pm
Chunabhatti - Chhatrapati Shivaji Maharaj Terminus Up harbour line from 10.40 am to 3.40 pm
Dn Harbour line special services to Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 11.15 am to 4.00 pm will remain suspended.
Up Harbour line special services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel from 9.45 am to 2.41 pm will remain suspended.
However, special local trains will run o­n Panvel – Kurla (PlatformNo.8) - Panvel section during the block period.
Harbour line passengers are permitted to travel via Main line during the block period.
These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.

No comments: