Commercial Services of East West Metro Begins from 14.02.2020
18-02-2020
Kolkata
COMMERCIAL SERVICES OF EAST-WEST METRO BEGINS
The commercial services in the Phase-I of East-West Metro from Salt Lake Sector V to Salt Lake Stadium commence on 14.02.2020 at 08.00 hrs. from Sector V Metro Station and it reached Salt Lake Stadium after 12 minutes.
salt Shri Satyaki Nath, Principal Chief Operations Manager, Metro Railway handed over the first token of the East-West Metro to Shri Rajiv Roy, the first commuter of this Metro in presence of other Metro officials. Shri Nath also presented a memento to him to mark this memorable occasion. To commemorate this historic event, roses were given to the commuters of the 1st Metro.
Passengers were very happy to take this first journey in East-West Metro and expressed their joy coupled with emotion to be part of this historic event.
Commercial Services: -Commercial Service in this section will commence from 14th February, 2020 (14.02.2020). At present, 74 services (37 UP + 37 DN) will run on Weekdays and Saturdays. However, 50 services (25 UP + 25 DN) will run on Sundays.
Commercial Services: -Commercial Service in this section will commence from 14th February, 2020 (14.02.2020). At present, 74 services (37 UP + 37 DN) will run on Weekdays and Saturdays. However, 50 services (25 UP + 25 DN) will run on Sundays.
Time Schedule: - The first and the last service in this route will start at 08:00
hrs. and 20:00 hrs. respectively from both ends i.e. Salt Lake Sector-V and
Salt Lake Stadium on Weekdays and Saturdays.
However, on Sundays, the first and the last service will
commence at 12:00 hrs. and 20:00 hrs. from the both ends.
Ticketing System: - AFC-PC Gate, Smart Card and Smart
Token as in the North-South Metro.
Fare Chart:-
|
Distance
|
Fare
|
|
0
- 2 km
|
Rs.5
|
|
02
- 05 km
|
Rs.
10
|
|
05
- 10 km
|
Rs.
20
|
|
10
- 16.5 km
|
Rs.
30
|
Tourist Card Facilities
FARE
3 days………Rs. 250
5 days………Rs. 550
Student concession – 60%
SPECIAL FEATURES FOR THE FIRST TIME
·Platform Screen Doors at all
stations.
·Communication Based Train Control
System (CBTC) is the latest state-of-the-art signalling system which will
ensure the safe passage of trains and optimizes the line capacity.
·Toilets and designated seating
arrangements for Divyang.
·Sockets for Mobile and Laptop
chargers inside each coach.
·Ramps for emergency evacuation from
all coaches.
·Emergency announcements from
Operation Control Centre will be heard inside the coach.
SAFETY AND SECURITY MEASURES:
·CCTV cameras inside and outside the coaches for safety of
passengers with remote real time monitoring from Operation Control Centre (OCC)
as well as from the Motorman’s cab.
·One fire extinguisher is kept in each coach for use during any
onboard fire emergency.
·Heat/smoke and toxicity detectors inside each coach as part of
fire detection system.
·Integrated Station Management System has been provided with
fire alert and emergency activation facilities.
·Baggage Scanners and Door Frame Metal Detectors at all
stations.
·Security Monitoring Room on each platform.
source:kolkata metro
Today's Cancelled Trains

No comments:
Post a Comment