Breaking


Friday 24 May 2019

Special Traffic and Power Block Between Titwala and Kalyan Section

Special Traffic and Power Block Between Titwala and Kalyan Section
2019/5/22
24-05-2019
Special Traffic and Power Block between Titwala and Kalyan section
Central Railway will operate a special Traffic and Power Block o­n Up NE line Titwala-Kalyan from 00.00 hrs. to 03.00 hrs for lifting of tracks and special layouts o­n 24-25/.5.2019 (Friday-Saturday Night) and 25-26/5/2019(Saturday-Sunday Night) Due to this infrastructure upgrade block, the train running pattern will be as under:
Diversion of Dn Mail/Express Trains o­n Both days
  • 12141 LTT- Patliputra Express, 11057 CSMT-Amritsar Express, 12811 LTT- Hatia Express, 11093 Mahanagari Express and 12167 LTT-Varanasi Express will be taken o­n Platform No. 1/1A at Kalyan and will run 30-40 minutes behind schedule.
  • Diversion of UP Mail/Express Trains o­n Both days
  • 11062 Muzaffarpur-Lokmanya Tilak Terminus Express, 11058 Amritsar- Chhatrapati Shivaji Maharaj Terminus Express, 12541 Gorakhpur- LTT Express, 11016 Gorakhpur- LTT Kushinagar Express, 10830 Shalimar-LTT Express, 12810 Howrah-CSMT Mail via Nagpur, 11402 Nagpur-CSMT Nandigram Express, 12102 Howrah-LTT Express and 12545 Raxaul- LTT express will arrive destination 15-50 minutes behind schedule.

Cancellation of DN suburban trains o­n 24 & 25.5.2019
  • K-127 CSMT- Kalyan local leaving CSMT at 22.16 hrs
  • K-129 CSMT- Kalyan local leaving CSMT at 22.24 hrs
  • TL-67 CSMT- Titwala local leaving CSMT at 23.44 hrs
  • A-1 CSMT- Ambernath local leaving CSMT at 00.05 hrs o­n 25 & 26.5.2019
  • Cancellation of UP suburban trains o­n 24 & 25.5.2019
  • K-124 Kalyan- CSMT local leaving Kalyan at 21.04 hrs
  • K-126 Kalyan- CSMT local leaving Kalyan at 21.20 hrs
  • A-70 Ambernath-CSMT local leaving Ambernath at 22.01 hrs
  • TL-66 Titwala- CSMT local leaving Titwala at 22.06 hrs

Passengers are requested to bear with the Railway Administration for the inconvenience caused due to this block.These special blocks are essential for infrastructure enhancement 

No comments: