Traffic Block/Power Block on 24.03.2018 and 25.03.2018
2018/03/15
23-03-2018
Traffic and Power Block on 24/25.3.2018 (Midnight of Sat/Sun)
Central Railway will operate night traffic block of 5 hours and 35 minutes on 24/25.03.2018 (Midnight of Sat / Sun) for launching of foot over bridge girders over platform at Bhandup station. The details are as under –
Date of Block : 24/25.3.2018 (Sat-Sun night)
Duration of Block : Up & Down slow line between 00.30 hrs to 06.20 hrs
: Down fast line between 01.30 hrs to 03.30 hrs.
Diversion of Local Line services
Dn slow line services leaving Chhatrapati Shivaji Maharaj Terminus from 23.30 hrs of 24.3.2018 to 05.20 hrs of 25.3.2018will be diverted on Dn fast line between Vikhroli and Mulund stations and will not halt Kanjurmarg and Nahur stations.
Up slow line services leaving Thane from 00.06 hrs 05.56 hrs will be diverted on UP fast line between Mulund and Vikhroli stations and will not halt Nahur and Kanjurmarg stations.
Up and Dn Mail Express trains will arrive destination 15 minutes behind scheduled.
Passengers are requested to kindly bear with administration for the inconvenience caused.
Source:Central Railway
No comments:
Post a Comment